17 November, 2008

Lots of Screws

1.5 Hours

Tonight I drilled out the seat and baggage floors that were pop riveted in so I cold inspect the work in there and get it ready for final install. I also drilled out the rivets that will hold the gas tank bracket and the last bulkhead where I need to install the tail wheel support.

Not a lot to show but there were a lot of screws and I wanted to take things slow as not to strip any of the heads.

No pictures for now, but still moving in the right direction.

No comments: